concrete5 Environment Information
# concrete5 Version
5.6.3.4
# concrete5 Packages
Add Multiple Pages (1.3), Blueberry Image Slider (1.2), Deluxe Image Gallery (1.6.6), Designer Content (3.1.1), Free Cookies Disclosure (1.0.3), GalleryES (1.56), Image Blank Target (1.0), MP3 Player (1.0), Quickie Player (0.9.1), Redirect After (1.0), SEO Attributes (1.0), Treviso Theme (0.9.9).
# concrete5 Overrides
blocks/recpack, languages/vi_VN, languages/ja_JP, languages/fi_FI, languages/tr_TR, languages/fa_IR, languages/nl_NL, languages/es_ES, languages/da_DK, languages/fr_FR, languages/zh_TW, languages/sk_SK, languages/ar, languages/it_IT, languages/es_PE, languages/de_DE, languages/nb_NO, languages/el_GR, languages/sv_SE, languages/ru_RU, languages/es_MX, languages/pt_PT, languages/cs_CZ, languages/ro_RO, languages/sl_SI, languages/es_AR
# concrete5 Cache Settings
Block Cache - On
Overrides Cache - On
Full Page Caching - On - If blocks on the particular page allow it.
Full Page Cache Lifetime - Every 6 hours (default setting).
# Server Software
Apache
# Server API
apache2handler
# PHP Version
5.3.3
# PHP Extensions
apache2handler, bz2, calendar, Core, ctype, curl, date, dom, ereg, exif, fileinfo, filter, ftp, gd, gettext, gmp, hash, iconv, imap, ionCube Loader, json, libxml, mbstring, mcrypt, mysql, mysqli, openssl, pcre, PDO, pdo_mysql, pdo_sqlite, Phar, Reflection, session, shmop, SimpleXML, soap, sockets, SPL, sqlite3, standard, tokenizer, wddx, xml, xmlreader, xmlwriter, xsl, zip, zlib.
# PHP Settings
max_execution_time - 300
log_errors_max_len - 1024
max_file_uploads - 20
max_input_nesting_level - 64
max_input_time - 600
max_input_vars - 1000
memory_limit - 512M
post_max_size - 400M
safe_mode - Off
safe_mode_exec_dir - <i>no value</i>
safe_mode_gid - Off
safe_mode_include_dir - <i>no value</i>
sql.safe_mode - Off
upload_max_filesize - 400M
mysql.max_links - Unlimited
mysql.max_persistent - Unlimited
mysqli.max_links - Unlimited
mysqli.max_persistent - Unlimited
pcre.backtrack_limit - 100000
pcre.recursion_limit - 100000
session.cache_limiter - nocache
session.gc_maxlifetime - 7200
soap.wsdl_cache_limit - 5
safe_mode_allowed_env_vars - PHP_
safe_mode_protected_env_vars - LD_LIBRARY_PATH
Hide Post Content
This will replace the post content with the message: "Content has been removed by an Administrator"
Hide Content
If you want images to display in a certain order, the only way to do that is by making sure the images in the File Set used by the slider are in the order you want them. So, when you create the File Set, you need to move the images around to get them in the correct order. The slider will then display the images in that order.
I hope that makes sense.
Regards
James